Our Process for Home Additions and ADU Projects
Additions and ADUs are executed through a structured process designed to protect the existing home while integrating new construction deliberately and safely.
Feasibility & Pre-Construction
We begin by reviewing zoning constraints, evaluating structural conditions, confirming utility capacity, and aligning budgets with scope. Early coordination ensures additions and ADUs comply with jurisdictional requirements before permit submission.
Structural & Utility Planning
Before fieldwork begins, we align on structural engineering, foundation design, framing transitions, and infrastructure extensions. Inspection sequencing and material lead times are confirmed to reduce disruption once construction starts.
Controlled Integration
Construction is managed through consistent on-site oversight, deliberate sequencing, and quality control checkpoints. Structural tie-ins, roofing transitions, and utility connections are executed carefully to protect the integrity of existing homes.
Closeout & Final Inspection
We complete punch lists, coordinate final inspections, and finalize documentation so expanded space is delivered cleanly and in compliance with local requirements.